Skoda Fabia

Since 2000 of release



Shkoda Fabija
# 1.1. The car description
# 2. The engine
# 3. Greasing system
# 4. The power supply system
# 5. Cooling system
- 6. System of release of the fulfilled gases
   6.1. Check of tightness of system of release of the fulfilled gases
   6.2. Removal and installation of a reception pipe of the muffler (petrol engines)
   6.3. Removal and installation of a reception pipe of the muffler (diesel engines)
   6.4. Replacement of knots of the muffler in gathering (the resonator or the muffler)
   6.5. System рециркуляции the fulfilled gases (engines of 1,4 l, 55 and 74 kw)
   6.6. System рециркуляции the fulfilled gases (engines of 1,9 l, 74 kw)
   6.7. System рециркуляции the fulfilled gases (engines of 1,9 l, 47 kw)
# 7. Transmission and a running gear
# 8. A steering
# 9. Brake system
# 10. An electric equipment
# 11. A body
# 12. Electroschemes




6.5. System рециркуляции the fulfilled gases (engines of 1,4 l, 55 and 74 kw)
THE GENERAL DATA

System details рециркуляции the fulfilled gases of engines of 1,4 l, 55 and 74 kw

1 – connecting колодка;
2 – the valve рециркуляции;
3 – a hose to the air filter;
4 – a flange;
5 – bolts of fastening of a flange;
6 – a final collector;
7 – screws of fastening of a connecting pipe to a final collector;
8 – a bolt of fastening of a connecting pipe;
9 – a connecting pipe;
10 – bolts of fastening of the valve and an exhaust pipe;
11 – a lining

Check of the electromagnetic valve

Check of the electromagnetic valve see in subsection 4.25.

Removal and installation of elements of system рециркуляции

PERFORMANCE ORDER
1. Disconnect a wire from the plug - the storage battery.
2. Disconnect колодку 1 with wires from the electromagnetic valve of 2 systems рециркуляции.
3. Disconnect a hose 3 air filters from the electromagnetic valve of system рециркуляции.
4. Turn away two bolts of 10 fastenings and remove the electromagnetic valve.
5. For removal of a connecting pipe 9 turn away two screws 7 and a bolt of 8 its fastenings.
6. Replace linings 11 irrespective of their condition.
7. Establish system elements рециркуляции the fulfilled gases upside-down.

The moment of an inhaling of bolts of fastening of a connecting pipe – 10 Нм.